Project : Waha Land - Al Markaz Development Phase 1 Infrastructure Work
Client : Waha Land
Location : Abu Dhabi, UAE
Completed Date :
2010 - till present
Description Of Projects : BHE has the full responsibility for the sufficiency of the management of the scope of work in the project including all resources (labor, material, permanent and temporary plant and devices) and methods required for the fulfillment of, and in accordance with, the contract.

The Scope:

The design, construction and completion of the Infrastructure Works within the boundary of Phase 1 as shown in the contract drawings. The limit of works for the stages of construction within Phase 1 shall consider the functionality of each of the utilities.

In accordance with the Contract and the Employers Requirements this includes:

Foul Sewer

A sewerage network to be provided in accordance with the adoptable requirements of the Abu Dhabi Sewerage Services Company (ADSSC).

Stormwater

A storm water network to be provided in accordance with the requirements of the Abu Dhabi Municipality.

Potable Water and Fire Fighting

A potable water network to be provided in accordance with the adoptable requirements and specifications of the Abu Dhabi Distribution Company (ADDC) and ADWEA.

Irrigation

An irrigation network in accordance with the requirements and specifications of the Parks and Recreational Facilities Directorate (PRFD) of Abu Dhabi Municipality.

Roads

A road network in accordance with the adoptable requirements and specifications of ADM/DOT

Power

A power network in accordance with the adoptable requirements and specifications of ADWEA/ADDC and as shown in the attached drawings.

 

Telecom

The Telecom works shall be in accordance with the adoptable requirements and specifications of ETISALAT and as shown in the attached drawing.

Landscape

The landscaping works shall be in accordance with the requirements and specifications of Parks and Recreation Facilities Directorate (PRFD) and as shown in the attached drawings

Testing and commissioning

Preliminaries

Landscape

The landscaping works shall be in accordance with the requirements and specifications of Parks and Recreation Facilities Directorate (PRFD) and as shown in the attached drawings

Testing and commissioning

Preliminaries