Project : Construction of the Dualling Between Baniyas East and Al Heelieh Road
Client : Abu Dhabi Municipality
Location : Abu Dhabi, UAE
Completed Date :
2008 - 2010
Description Of Projects :

Scope of work  :

The major work comprised of  construction and widening of  Road between Baniyas East and Al Heelieh Road  of 30Kms , Construction of Interchange,  Building 1 Underpass of  44.50m in length, Approach to underpass of 480m ,and Building of 5 Utility Bridges.  On a note of achievement, long distance Facing Panel of 1.5 Km was built for the first time in UAE by Bin Hafeez General Cont. Est.

Main works:

  • Construction of a twin two span pre-stressed box girder bridge.  Each span is 35.50 m in length and 20.05 in width.

  • Construction of two roundabouts.

  • Construction of four ramps approximately 4.7 km total length.

  • Construction of an underpass 44.50 m in length.

  • Construction of approaches to the underpass 480m in length.

  • Construction of three protection culverts to existing gas and multi products lines.

  • Widening existing carriageway to three lanes and increasing the width of shoulders to 3m on both sides.

  • Improving the vertical alignment of the existing carriageway and laying new wearing course layer for an approximate length of 15.5km.

  • Construction of a new second carriageway for a approximate length of 14.5km.

  • Providing accesses to existing and future buildings along the road.

  • Link roads to the new sectors in Al Heeliah from the interchange.

  • Relocation of existing services.

  • Street lighting, road furniture, fences, contingency ducts, stormwater system etc.
  • Relocation and protection of waterlines works

    Electrical relocation & development works

    Etisalat works

    • Construction of a twin two span pre-stressed box girder bridge.  Each span is 35.50 m in length and 20.05 in width.

    • Construction of two roundabouts.

    • Construction of four ramps approximately 4.7 km total length.

    • Construction of an underpass 44.50 m in length.

    • Construction of approaches to the underpass 480m in length.

    • Construction of three protection culverts to existing gas and multi products lines.

    • Widening existing carriageway to three lanes and increasing the width of shoulders to 3m on both sides.

    • Improving the vertical alignment of the existing carriageway and laying new wearing course layer for an approximate length of 15.5km.

    • Construction of a new second carriageway for a approximate length of 14.5km.

    • Providing accesses to existing and future buildings along the road.

    • Link roads to the new sectors in Al Heeliah from the interchange.

    • Relocation of existing services.

    • Street lighting, road furniture, fences, contingency ducts, stormwater system etc.
  • Relocation and protection of waterlines works

    Electrical relocation & development works

    Etisalat works

  •